Panama Canal

Panama Canal
{{{alt}}}
A schematic of the Panama Canal, illustrating the sequence of locks and passages
Original Owner La Société internationale du Canal interocéanique
Principal Engineer John Findlay Wallace, John Frank Stevens (1906–1908), George Washington Goethals
Date of first use August 15, 1914
Locks 3 locks up, 3 down per transit; all two lanes

(2 lanes of locks; locks built in three sites)

Status Open
Navigation Authority Panama Canal Authority
Location of Panama between Pacific (bottom) and Caribbean (top), with canal at top center

The Panama Canal began in 1904 and finished 1914 is a 77 km (48 mi) ship canal in Panama that joins the Atlantic Ocean and the Pacific Ocean and is a key conduit for international maritime trade. Annual traffic has risen from about 1,000 ships in the canal's early days to 14,702 vessels in 2008, measuring a total 309.6 million Panama Canal/Universal Measurement System (PC/UMS) tons.

One of the largest and most difficult engineering projects ever undertaken, the canal had an enormous impact on shipping between the two oceans, replacing the long and treacherous route via the Drake Passage and Cape Horn at the southernmost tip of South America. A ship sailing from New York to San Francisco via the canal travels 9,500 km (5,900 mi), well under half the 22,500 km (14,000 mi) route around Cape Horn.[1]

The concept of a canal near Panama dates to the early 16th century. The first attempt to construct a canal began in 1880 under French leadership, but was abandoned after 21,900 workers died, largely from disease (particularly malaria and yellow fever) and landslides. The United States launched a second effort, incurring a further 5,600 deaths but succeeding in opening the canal in 1914. The U.S. controlled the canal and the Canal Zone surrounding it until the 1977 Torrijos–Carter Treaties provided for the transition of control to Panama. From 1979 to 1999 the canal was under joint U.S.–Panamanian administration, and from 31 December 1999 command of the waterway was assumed by the Panama Canal Authority, an agency of the Panamanian government.

While the Pacific Ocean is west of the isthmus and the Atlantic to the east, the 8- to 10-hour journey through the canal from the Pacific to the Atlantic is one from southeast to northwest. This is a result of the isthmus's "curving back on itself" in the region of the canal. The Bridge of the Americas at the Pacific end is about a third of a degree of longitude east of the end near Colon on the Atlantic.[2]

The maximum size of vessel that can use the canal is known as Panamax.

Contents

History

Satellite image showing location of Panama canal. Dense jungles are visible in green.

Early proposals

The earliest mention of a canal across the Isthmus of Panama dates to 1534, when Charles V, Holy Roman Emperor and King of Spain ordered a survey for a route through Panama that would ease the voyage for ships traveling to and from Spain and Peru, as well as give the Spanish a tactical military edge over the Portuguese.[3] During his expedition of 1788–1793, Alessandro Malaspina demonstrated the feasibility of a canal and outlined plans for its construction.[4] Given the strategic situation of Panama and its narrow isthmus separating two great oceans, other forms of trade links were attempted over the years. The ill-fated Darien scheme was an attempt launched by the Kingdom of Scotland in 1698 to set up an overland trade route, but was defeated by the generally inhospitable conditions, and abandoned in July of 1699.[5] Finally, the Panama Railway was built across the isthmus, opening in 1855. This overland link became a vital piece of infrastructure, greatly facilitating trade and largely determining the later canal route.

Also in 1855, William Kennish, a Manx-born engineer in the employ of the United States government, surveyed and issued a report on a route for a proposed Panama Canal.[6] His report was published in a book entitled The Practicality and Importance of a Ship Canal to Connect the Atlantic and Pacific Oceans.[7]

French construction attempt

An all-water route between the oceans was still seen as the ideal solution, and the idea of a canal was enhanced by the success of the Suez Canal. The French, under Ferdinand de Lesseps, began construction on a sea-level canal (i.e., without locks) through what was then Colombia's province of Panama, on January 1, 1880. The French began work in a rush, with insufficient prior study of the geology and hydrology of the region.[8] Excavation was conducted at such a steep angle that, in some years, rain-induced landslides poured nearly as much material into the canal as had been removed.[9] In addition, disease, particularly malaria and yellow fever, sickened and killed vast numbers of employees, ranging from laborers to top directors of the French company. Public health measures were ineffective because the role of the mosquito as a disease vector was then unknown. These conditions made it impossible to maintain an experienced work force as fearful technical employees quickly returned to France. Even the hospitals contributed to the problem, unwittingly providing breeding places for mosquitoes inside the unscreened wards. Actual conditions were hushed up in France to avoid recruitment problems.[8] In 1893, after a great deal of work, the French scheme was abandoned due to disease and the sheer difficulty of building a sea-level canal, as well as lack of French field experience, such as with downpours that caused steel equipment to rust.[10] The high toll from disease was one of the major factors in the failure; as many as 22,000 workers were estimated to have died during the main period of French construction (1881–1889).[8]

Beyond the hygienic and technical difficulties, financial mismanagement and political corruption also contributed to the French failure.

U.S. construction

Construction work on the Gaillard Cut is shown in this photograph from 1907

At this time, various interests in the United States were also expressing interest in building a canal across the isthmus, with some favouring a route across Nicaragua (see Nicaragua Canal) and others advocating the purchase of the French interests in Panama. Eventually, in June 1902, the U.S. Senate voted in favor of pursuing the Panamanian option, provided the necessary rights could be obtained. (It is claimed that the vote was swayed by William Nelson Cromwell.[11])

On January 22, 1903, the Hay-Herran Treaty was signed by United States Secretary of State John M. Hay and Dr. Tomás Herrán of Colombia. It would have granted the United States a renewable lease in perpetuity from Colombia on the land proposed for the canal.[12] This is often misinterpreted as the "99-year lease" due to misleading wording included in article 22 of the agreement that refers to property within the land but does not pertain to the control of the canal and the right for the United States to renew the lease indefinitely.[13] It was ratified by the United States Senate on March 14, 1903, but the Senate of Colombia did not ratify the treaty. Philippe Bunau-Varilla, chief engineer of the French canal company, told Roosevelt and Hay of a possible revolt and hoped that the U.S. would support it with troops and money. President of the United States Theodore Roosevelt changed tactics, promising support for Panama's intermittent separatist movement. On November 2, 1903, U.S. warships blocked sealanes for Colombian troops from coming to put down the revolt, while dense jungles blocked land routes. Panama achieved independence on November 3, 1903 when the United States sent naval forces to encourage Colombia's surrender of the region. The United States quickly recognized them. Also, on November 6, 1903, Phillipe Bunau-Varilla, Panama's ambassador to the United States, signed the Hay-Bunau Varilla Treaty, granting rights to the United States to build and indefinitely administer the Panama Canal. Although Bunau-Varilla was serving as Panama's ambassador, he was a French citizen and was not authorized to sign treaties on behalf of Panama without Panamanian review. This treaty would later become a contentious diplomatic issue between the two countries.

The United States, under President Theodore Roosevelt, bought out the French equipment and excavations for US$40 million and began work on May 4, 1904. The United States paid Colombia $25,000,000 in 1921, seven years after completion of the canal, for redress of President Roosevelt's role in the creation of Panama, and Colombia recognized Panama under the terms of the Thomson-Urrutia Treaty.

John Frank Stevens, Chief Engineer from 1905 to 1907, argued the case against a sea-level canal like the French had tried to build and convinced Theodore Roosevelt of the necessity of a canal built with dams and locks. Stevens' primary achievement in Panama was in building the infrastructure necessary to complete the canal. He rebuilt the Panama Railway and devised a system for disposing of soil from the excavations by rail. He also built proper housing for canal workers and oversaw investment in extensive sanitation and mosquito-control programmes that eliminated disease from the area — particularly malaria and yellow fever, the vector of which had been identified as the mosquito by Cuban physician and scientist Dr. Carlos Finlay in 1881. Finlay's theory and investigative work had recently been confirmed by Dr. Walter Reed while in Cuba with U.S. Army motivation during the Spanish-American War (see also Health measures during the construction of the Panama Canal).

SS Kroonland at the Culebra Cut while transiting the Panama Canal on 2 February 1915.

With the diseases under control, and after significant work on preparing the infrastructure, construction of an elevated canal with locks began in earnest and was finally possible. The Americans also gradually replaced the old French equipment with machinery designed for a larger scale of work (such as the giant hydraulic crushers supplied by the Joshua Hendy Iron Works) to quicken the pace of construction.[8] President Roosevelt had the former French machinery minted into medals for all workers who spent at least two years on the construction to commemorate their contribution to the building of the canal. These medals featured Roosevelt's likeness on the front, the name of the recipient on one side, and the worker's years of service, as well as a picture of the Culebra Cut on the back.[14]

In 1907 Roosevelt appointed George Washington Goethals as Chief Engineer of the Panama Canal. Ellicott Dredges, a Baltimore, MD, USA company formerly known as the Ellicott Machine Company, built the cutter dredges used in construction of the Panama Canal [15]. The first machine delivered was a steam-driven, 900 HP, 20-inch dredge. In 1941, Ellicott Dredges also built the dredge MINDI, a 10,000 HP, 28-inch cutter suction dredge still operating in the Panama Canal.

The building of the canal was completed in 1914, two years ahead of the target date of June 1, 1916. The canal was formally opened on August 15, 1914 with the passage of the cargo ship SS Ancon.[16] Coincidentally, this was also the same month that fighting in World War I (the Great War) began in Europe. The advances in hygiene resulted in a relatively low death toll during the American construction; still, 5,609 workers died during this period (1904–1914).[17] This brought the total death toll for the construction of the canal to around 27,500.

Construction of locks on the Panama Canal, 1913

Later developments

By the 1930s it was seen that water supply would be an issue for the canal; this prompted the building of the Madden Dam across the Chagres River above Gatun Lake. The dam, completed in 1935, created Madden Lake (later Alajuela Lake), which acts as additional water storage for the canal. In 1939, construction began on a further major improvement: a new set of locks for the canal, large enough to carry the larger warships which the United States was building at the time and had planned to continue building. The work proceeded for several years, and significant excavation was carried out on the new approach channels, but the project was canceled after World War II.[18][19]

After the war, U.S. control of the canal and the Canal Zone surrounding it became contentious as relations between Panama and the U.S. became increasingly tense. Many Panamanians felt that the Canal Zone rightfully belonged to Panama; student protests were met by the fencing in of the zone and an increased military presence.[20] The unrest culminated in riots in which approximately 20 Panamanians and 3–5 U.S. soldiers were killed on Martyr's Day, January 9, 1964. Negotiations toward a new settlement began in 1974, and resulted in the Torrijos-Carter Treaties. Signed by President of the United States Jimmy Carter and Omar Torrijos of Panama on September 7, 1977, this mobilized the process of granting the Panamanians free control of the canal so long as Panama signed a treaty guaranteeing the permanent neutrality of the canal. The treaty led to full Panamanian control effective at noon on December 31, 1999, and the Panama Canal Authority (ACP) assumed command of the waterway.

Before this handover, the government of Panama held an international bid to negotiate a 25-year contract for operation of the container shipping ports located at the canal’s Atlantic and Pacific outlets. The contract was not affiliated with the ACP or Panama Canal operations and was won by the firm Hutchison Whampoa, a Hong Kong-based shipping concern whose owner is Li Ka Shing.

Layout

USS Missouri passes through the canal in 1945

The canal consists of artificial lakes, several improved and artificial channels, and three sets of locks. An additional artificial lake, Alajuela Lake (known during the American era as Madden Lake), acts as a reservoir for the canal. The layout of the canal as seen by a ship passing from the Pacific end to the Atlantic is as follows:[21]

Thus, the total length of the canal is 50 mi (80 km).

Point Coordinates
(links to map & photo sources)
Notes
Atlantic Entrance
Gatún Locks
Trinidad Turn
Bohío Turn
Orchid Turn
Frijoles Turn
Barbacoa Turn
Mamei Turn
Gamboa Reach
Bas Obispo Reach
Las Cascadas Reach
Empire Reach
Culebra Reach
Cucaracha Reach
Paraiso Reach
Pedro Miguel Locks
Miraflores Lake
Miraflores Locks
Balboa Reach
Pacific Entrance

Lock size

Miter lock gate at Gatún
lock gate at Miraflores

The size of the locks determines the maximum size of ships allowed passage. The sizes are defined as Panamax. Initially the locks at Gatun had been designed as 28.5 meters (94 ft) wide. In 1908 the United States Navy requested that the locks should be increased to have a width of at least 36 meters (118 ft) which would allow the passage of US naval ships. Eventually a compromise was made and the locks were to be constructed to a width of 33.53 meters (110.0 ft). Each lock is 320 meters (1,050 ft) long with the walls ranging in thickness from 15 meters (49 ft) at the base to 3 meters (9.8 ft) at the top. The central wall between the parallel locks at Gatún has a thickness of 18 meters (59 ft) and stands in excess of 24 meters (79 ft) in height. The lock gates are made from steel and measure an average of 2 meters (6.6 ft) thick, 19.5 meters (64 ft) in width and 20 meters (66 ft) in height.[22] It is the size of the locks, specifically the Pedro Miguel Locks, along with the height of the Bridge of the Americas at Balboa, that determine the Panamax metric and limit the size of ships that may use the Canal.

The 2006 Third lock lane project creates larger locks, thereby allowing bigger ships through. The allowed dimensions of ships are enlarged by up to 50%, as defined by New Panamax[23].

Tolls

RORO carriers, such as this one at Miraflores locks, are among the largest ships to use the canal

Tolls for the canal are decided by the Panama Canal Authority and are based on vessel type, size, and the type of cargo carried.[24]

For container ships, the toll is assessed per the ship's capacity expressed in twenty-foot equivalent units or TEUs. One TEU is the size of a container measuring 20 feet (6.1 m) by 8 feet (2.44 m) by 8.5 feet (2.6 m). Effective May 1, 2009, this toll is US$72.00 per TEU. A Panamax container ship may carry up to 4,400 TEU. The toll is calculated differently for passenger ships and for container ships carrying no cargo (“in ballast”). As of May 1, 2009 the ballast rate is US$57.60 per TEU.

Passenger vessels in excess of 30,000 tons (PC/UMS), known popularly as cruise ships, pay a rate based on the number of berths, that is, the number of passengers that can be accommodated in permanent beds. The per-berth charge is currently $92 for unoccupied berths and $115 for occupied berths. Started in 2007, this charge has greatly increased tolls for such vessels.[25] Passenger vessels of less than 30,000 tons or with less than 33 tons per passenger are charged on the same "per-ton" schedule as freighters.[26]

Most other types of vessel pay a toll per PC/UMS net ton, in which one "ton" is actually a volume of 100 cubic feet (2.83 m3). (The calculation of tonnage for commercial vessels is quite complex.) As of fiscal year 2008, this toll is US$3.90 per ton for the first 10,000 tons, US$3.19 per ton for the next 10,000 tons, and US$3.82 per ton for the next 10,000 tons, and US$3.76 per ton thereafter. As with container ships, a reduced toll is charged for freight ships "in ballast".

Small vessels up to 583 PC/UMS net tons when carrying passengers or cargo, or up to 735 PC/UMS net tons when in ballast, or up to 1,048 fully loaded displacement tons, are assessed minimum tolls based upon their length overall, according to the following table :

Length of vessel Toll
Up to 15.240 meters (50 ft) US$1,300
More than 15.240 meters (50 ft) up to 24.384 meters (80 ft) US$1,400
More than 24.384 meters (80 ft) up to 30.480 meters (100 ft) US$1,500
More than 30.480 meters (100 ft) US$2,400

The most expensive regular toll for canal passage to date was charged on May 16, 2008 to the Disney Magic, which paid US$331,200.[27][28] The least expensive toll was 36 cents to American adventurer Richard Halliburton, who swam the canal in 1928.[29] The average toll is around US$54,000. The highest fee for priority passage charged through the Transit Slot Auction System was US$220,300, paid on August 24, 2006 by the Panamax tanker Erikoussa,[30] bypassing a 90-ship queue waiting for the end of maintenance works on the Gatun locks, thus avoiding a seven-day delay. The normal fee would have been just US$13,430.[31]

Current issues

Panorama of Pacific entrance of the canal.
Panorama of Pacific entrance of the canal. Left: Pacific and Puente de las Americas (Pan American Highway); far right: Miraflores locks.

Ninety-five years since its opening, the canal continues to enjoy great success. Even though world shipping—and the size of ships themselves—has changed markedly since the canal was designed, it continues to be a vital link in world trade, carrying more cargo than ever before, with fewer overhead costs. Nevertheless, the canal faces a number of potential problems.

Efficiency and maintenance

There were fears that efficiency and maintenance would suffer following the U.S. withdrawal; however, this does not appear to be the case. Capitalizing on practices developed during the American administration, canal operations are improving under Panamanian control.[32] Canal Waters Time (CWT), the average time it takes a vessel to navigate the canal, including waiting time, is a key measure of efficiency; according to the ACP, since 2000, it has oscillated between 20 and 30 hours. The accident rate has also not changed appreciably in the past decade, varying between 10 and 30 accidents each year across approximately 14,000 total annual transits.[33][34][35] An official accident is one in which a formal investigation is requested and conducted.

Increasing volumes of imports from Asia which previously landed on the U.S. west-coast ports are now passing through the canal to the American east coast.[36] The total number of oceangoing transits increased from 11,725 in 2003 to 13,233 in 2007, falling to 12,855 in 2009. (the Canal’s fiscal year runs from October to September).[37] This has been coupled with a steady rise in average ship size and in the numbers of Panamax vessels passing, so that the total tonnage carried rose from 227.9 million PC/UMS tons in fiscal year 1999 to a record high of 312.9 million tons in 2007, falling to 299.1 million tons in 2009.[2][37][38] Despite the reduction in total transits due to the negative impact of vessel size (e.g., the inability of large vessels to pass each other in the Gaillard Cut), this represents significant overall growth in canal capacity.

A bucket dredge works to deepen and widen the canal.

The Panama Canal Authority (ACP) has invested nearly US$1 billion in widening and modernising the canal, with the aim of increasing capacity by 20%.[39] The ACP cites a number of major improvements, including the widening and straightening of the Gaillard Cut to reduce restrictions on passing vessels, the deepening of the navigational channel in Gatun Lake to reduce draft restrictions and improve water supply, and the deepening of the Atlantic and Pacific entrances of the canal. This is supported by new equipment, such as a new drill barge and suction dredger, and an increase of the tug boat fleet by 20%. In addition, improvements have been made to the operating machinery of the canal, including an increased and improved tug locomotive fleet, the replacement of more than 16 km of locomotive track, and new lock machinery controls. Improvements have been made to the traffic management system to allow more efficient control over ships in the canal.[40]

The withdrawal of the U.S. has allowed Panama to sell excess electricity produced by the canal's dams, which was previously prohibited by the U.S. government. Only 25% of the hydroelectric power produced in the canal system is required to run the canal.

Capacity

The canal is presently handling more vessel traffic than had ever been envisioned by its builders. In 1934 it was estimated that the maximum capacity of the canal would be around 80 million tons per year;[41] as noted above, canal traffic in 2009 consisted of 299.1 million tons of shipping.

The water that is used to raise and lower vessels in the Canal is fed by gravity from Gatun Lake (pictured above) into each set of locks.

To improve capacity a number of improvements have been imposed on the current canal system. These improvements aim to maximise the possible use of current locking system:[42]

These improvements will enlarge the capacity from 280–290 million PCUMS (2008) to 330–340 PCUMS (2012).

Competition

Despite having enjoyed a privileged position for many years, the canal is increasingly facing competition from other quarters. Because canal tolls are expected to rise, some critics[43] have suggested that the Suez Canal may become a viable alternative for cargo en route from Asia to the U.S. east coast. The Panama Canal, however, continues to serve more than 144 of the world’s trade routes and the majority of canal traffic comes from the "All-Water Route" (the route from Asia to the U.S. East and Gulf Coasts via the Panama Canal).

The increasing rate of melting of ice in the Arctic Ocean has led to speculation that the Northwest Passage or Arctic Bridge may become viable for commercial shipping at some point in the future. This route would save 9,300 km (5,800 mi) on the route from Asia to Europe compared with the Panama Canal, possibly leading to a diversion of some traffic to that route. However, such a route is beset by unresolved territorial issues and would still hold significant problems due to ice.[44]

Water issues

Gatun Lake is filled with rainwater, and the lake accumulates excess water during wet months. The water is lost to the oceans at a rate of 101,000 m3 (26,700,000 US gal; 22,200,000 imp gal) per lock-cycle going downwards. Since a ship will have to go upward to Lake Gatun first and then descend, a single passing will cost double the amount, but the same waterflow cycle can be used for another ship passing in the opposite direction. The ship's submerged volume is not relevant to the amount of water.[29][45] During the dry season, when there is less rainfall, there is also a shortfall of water in Gatun Lake.

As a signatory to the United Nations Global Compact and a member of the World Business Council for Sustainable Development, the ACP has developed an environmentally and socially sustainable program for expansion, which will protect the aquatic and terrestrial resources of the Canal Watershed. After completion, expansion will guarantee the availability and quality of water resources by using unique water-saving basins at each new lock. These water-saving basins will diminish water loss and preserve freshwater resources along the waterway by reusing water from the basins into the locks. Each lock chamber will have three water-saving basins, which will reuse 60 percent of the water in each transit. There are a total of nine basins for each of the two lock complexes, and a total of 18 basins for the entire project.

The Pacific side sea level is about 20 centimeters (8 inches) higher than that of the Atlantic side due to differences in ocean conditions such as water densities and weather conditions.[46]

The future

As demand is rising, the canal is positioned to be a significant feature of world shipping for the foreseeable future. However, changes in shipping patterns—particularly the increasing numbers of post-Panamax ships—will necessitate changes to the canal if it is to retain a significant market share. It is anticipated that by 2011, 37% of the world's container ships will be too large for the present canal, and hence a failure to expand would result in a significant loss of market share. The maximum sustainable capacity of the present canal, given some relatively minor improvement work, is estimated at between 330 and 340 million PC/UMS tons per year; it is anticipated that this capacity will be reached between 2009 and 2012. Close to 50% of transiting vessels are already using the full width of the locks.[47]

An enlargement scheme similar to the 1939 Third Lock Scheme, to allow for a greater number of transits and the ability to handle larger ships, has been under consideration for some time,[48] has been approved by the government of Panama,[49] and is in progress, with completion expected in 2014.[50] The cost is estimated at US$5.25 billion, and the project will double the canal's capacity and allow more traffic and the passage of longer and wider ships. This proposal to expand the canal was approved in a national referendum by approximately 80% on October 22, 2006.[51]

Third set of locks project

The current plan is for two new flights of locks to be built parallel to, and operated in addition to, the old locks: one to the east of the existing Gatún locks, and one south west of Miraflores locks, each supported by approach channels. Each flight will ascend from ocean level direct to the Gatún Lake level; the existing two-stage ascent at Miraflores / Pedro Miguel will not be replicated. The new lock chambers will feature sliding gates, doubled for safety, and will be 427 meters (1,400 ft) long, 55 meters (180 ft) wide, and 18.3 meters (60 ft) deep; this will allow the transit of vessels with a beam of up to 49 meters (160 ft), an overall length of up to 366 meters (1,200 ft) and a draft of up to 15 meters (50 ft), equivalent to a container ship carrying around 12,000 twenty-foot (6.1 m) long containers (TEU).

The new locks will be supported by new approach channels, including a 6.2 km (3.8 mi) channel at Miraflores from the locks to the Gaillard Cut, skirting around Miraflores Lake. Each of these channels will be 218 meters (715 ft) wide, which will require post-Panamax vessels to navigate the channels in one direction at a time. The Gaillard Cut and the channel through Gatún Lake will be widened to no less than 280 meters (918 ft) on the straight portions and no less than 366 meters (1,200 ft) on the bends. The maximum level of Gatún Lake will be raised from reference height 26.7 meters (87.5 ft) to 27.1 meters (89 ft).

Each flight of locks will be accompanied by nine water reutilization basins (three per lock chamber), each basin being approximately 70 meters (230 ft) wide, 430 meters (1410 ft) long and 5.50 meters (18 ft) deep. These gravity-fed basins will allow 60% of the water used in each transit to be reused; the new locks will consequently use 7% less water per transit than each of the existing lock lanes. The deepening of Gatún Lake, and the raising of its maximum water level, will also provide significant extra water storage capacity. These measures are intended to allow the expanded canal to operate without the construction of new reservoirs.

The estimated cost of the project is US$5.25 billion. The project is designed to allow for an anticipated growth in traffic from 280 million PC/UMS tons in 2005 to nearly 510 million PC/UMS tons in 2025; the expanded canal will have a maximum sustainable capacity of approximately 600 million PC/UMS tons per year. Tolls will continue to be calculated based on vessel tonnage, and will not depend on the locks used.

The new locks are expected to open for traffic in 2015. The present locks, which will be 100 years old by that time, will then have greater access for maintenance, and are projected to continue operating indefinitely.[47] An article in the February 2007 issue of Popular Mechanics magazine describes the plans for the canal, focusing on the engineering aspects of the expansion project.[52] There is also a follow-up article in the February 2010 issue of Popular Mechanics magazine.[53]

On September 3, 2007, thousands of Panamanians stood across Paraíso Hill in Panama to witness a huge explosion and the launch of the Expansion Program. The first phase of the project will be dry excavations of the 218 meter (715 ft) wide trench connecting the Culebra Cut with the Pacific coast, removing 47 million cubic meters of earth and rock.[54]

Building the new canal

It was announced in July 2009 that the Flemish (Northern Belgium) dredging company Jan De Nul, together with a consortium of contractors consisting of the Spanish Sacyr Vallehermoso, the Italian Impregilo and the Panamanian company Cusa, had been awarded the contract to build the six new locks. The contract will result in $100 million in dredging works over the next few years for the company, and a great deal of work for the company's construction division. The design of the locks is a carbon copy of the Berendrecht lock in the Port of Antwerp, which De Nul helped build in the 1980s; the company still has engineers and specialists who were part of that project.[55]

Canal Pilots

During the last one hundred years, the Autoridad del Canal de Panamá has appointed a few "Panama Canal Honorary Pilots". The most recent of these were Commodore Ronald Warwick,[56] a former Master of the Cunard Line's RMS Queen Mary 2, who has traversed the Canal more than 50 times, and Captain Raffaele Minotauro, Master Senior Grade, of the former Italian governmental navigation company known in the shipping world as the "Italian Line".

See also


References

  1. Scott, William R. (1913). The Americans in Panama. New York, NY: Statler Publishing Company. http://www.czbrats.com/AmPan/index.htm. 
  2. 2.0 2.1 "Panama Canal Traffic — Fiscal Years 2002–2004" (PDF). Panama Canal Authority. http://www.pancanal.com/eng/maritime/reports/table01.pdf. Retrieved 2007-09-03. 
  3. "A History of the Panama Canal: French and American Construction Efforts". Panama Canal Authority. http://www.pancanal.com/eng/history/history/index.html. Retrieved 2007-09-03. ; Chapter 3, Some Early Canal Plans
  4. Caso, Adolph; Marion E. Welsh (1978). They Too Made America Great. Branden Books. pp. 72. ISBN 0828317143. ; online at Google Books
  5. "Darien Expedition". http://www.kinnaird.net/darien.htm. Retrieved 2007-09-03. 
  6. "Manx Worthies".
  7. The Practicality and Importance of a Ship Canal to Connect the Atlantic and Pacific Oceans.
  8. 8.0 8.1 8.2 8.3 Avery, Ralph E. (1913). "The French Failure". America's Triumph in Panama. Chicago, IL: L.W. Walter Company. http://www.czbrats.com/Builders/FRCanal/failure.htm. 
  9. Rocco, Fiammetta (2003). The Miraculous Fever-Tree. HarperCollins. pp. 192. ISBN 0006532357. ]
  10. "Read our history: The French Canal Construction". Panama Canal Authority. http://www.pancanal.com/eng/history/history/index.html. Retrieved 2007-09-03. 
  11. Overthrow, Stephen Kinzer, 2006.
  12. http://www.u-s-history.com/pages/h930.html
  13. http://avalon.law.yale.edu/20th_century/pan001.asp
  14. "The Roosevelt Medal". National Museum of American History, Smithsonian Institution. http://historywired.si.edu/object.cfm?ID=195. Retrieved 2008-06-05. 
  15. "Panama Canal: The Big Dig of Central America". Construction Equipment Guide. 2006-11-24. http://www.constructionequipmentguide.com/Panama-Canal-The-Big-Dig-of-Central-America/7868/. Retrieved 2010-08-27. 
  16. "Read our history: American Canal Construction". Panama Canal Authority. http://www.pancanal.com/eng/history/history/index.html. Retrieved 2007-09-03. 
  17. "A History of the Panama Canal: French and American Construction Efforts". Panama Canal Authority. http://www.pancanal.com/eng/history/history/end.html. Retrieved 2007-09-03. 
  18. Enlarging the Panama Canal, Alden P. Armagnac, CZ Brats
  19. Enlarging the Panama Canal for Bigger Battleships, notes from CZ Brats
  20. The Martyrs of 1964, by Eric Jackson
  21. "Historical Map & Chart Project". NOAA. http://historicals.ncd.noaa.gov/historicals/histmap.asp. Retrieved 2007-09-03. 
  22. "The Panama Canal". http://www.eclipse.co.uk/~sl5763/panama.htm. Retrieved 2007-10-18. 
  23. http://www.pancanal.com/common/maritime/advisories/2009/a-02-2009.pdf New Panamax publication by ACP
  24. "Maritime Operations — Tolls". Panama Canal Authority. http://www.pancanal.com/eng/maritime/tolls.html. 
  25. Panama Canal Toll Table http://www.pancanal.com/eng/maritime/tolls.html
  26. Almost all major cruise ships have more than 33 tons per passenger; the rule of thumb for cruiseline comfort is generally given as a minimum of 40 tons per passenger. Note that a ton is not a unit of weight, but displacement, and represents a volume of about 100 cubic feet.
  27. "Crucero paga cifra récord en Canal de Panamá" (in Spanish). Terra Noticias. 2008-06-10. http://noticias.terra.com/noticias/articulo/html/act1287447.htm. Retrieved 2009-08-08. 
  28. "ACP rectifica récord en pago de peaje" (in Spanish). La Prensa. 2008-06-24. http://mensual.prensa.com/mensual/contenido/2008/06/24/hoy/negocios/1416962.html. Retrieved 2009-08-08. 
  29. 29.0 29.1 "The Panama Canal; Canal FAQ". http://www.pancanal.com/eng/noticiero/canal-faqs/index.html. 
  30. "''Récord en pago de peajes y reserva''. ''La Prensa''. Sección Economía & Negocios. Edition 2007-04-24". Ediciones.prensa.com. http://ediciones.prensa.com/mensual/contenido/2007/04/24/hoy/negocios/960466.html. Retrieved 2009-07-13. 
  31. "''Cupo de subasta del Canal alcanza récord''. La Prensa. Sección Economía & Negocios. Edición 25/08/2006 in Spanish". Mensual.prensa.com. http://mensual.prensa.com/mensual/contenido/2006/08/25/hoy/negocios/714407.html. Retrieved 2009-07-13. 
  32. "A Man, A Plan, A Canal: Panama Rises". Smithsonian Magazine. Smithsonian Institution. March 2004. http://www.smithsonianmag.si.edu/smithsonian/issues04/mar04/panama.html. 
  33. "ACP 2005 Annual Report" (PDF). Panama Canal Authority. 2005. http://www.pancanal.com/common/general/reports/informe-anual-2005.pdf. Retrieved 2010-07-09. 
  34. "News - PanCanal.com; Panama Canal Authority Announces Fiscal Year 2008 Metrics". Panama Canal Authority. 2008-10-24. http://www.pancanal.com/eng/pr/press-releases/2008/10/24/pr300.html. Retrieved 2010-07-09. 
  35. "News - PanCanal.com; Panama Canal Authority Announces Fiscal Year 2009 Metrics". Panama Canal Authority. 2009-10-30. http://www.pancanal.com/eng/pr/press-releases/2009/10/30/pr366.html. Retrieved 2010-07-09. 
  36. Lipton, Eric (2004-11-22). "New York Port Hums Again, With Asian Trade". New York Times. http://www.colliers.com/Content/Attachments/Corporate/Services/NewYorkTimes112204.htm. 
  37. 37.0 37.1 "ACP 2009 Annual Report" (PDF). Panama Canal Authority. 2009. http://www.pancanal.com/eng/general/reporte-anual/2009/pdf/InformePDFingles.pdf. Retrieved 2010-07-09. 
  38. "Panama Canal Traffic - Fiscal Years 2006 through 2008". Panama Canal Authority. http://www.pancanal.com/eng/maritime/reports/table01.pdf. 
  39. Nettleton, Steve (1999). "Transfer heavy on symbolism, light on change". CNN Interactive. http://www.cnn.com/SPECIALS/1999/panama.canal/stories/operation/. 
  40. "Modernisation & Improvements". Panama Canal Authority. http://www.pancanal.com/eng/projects/overview.html. 
  41. Mack, Gerstle (1944). The Land Divided - A History of the Panama Canal and other Isthmian Canal Projects. http://www.czimages.com/CZMemories/thirdlocks/tlpage3.htm. 
  42. Proposal for the Expansion of the Panama Canal by the Panama Canal Authority, p. 45
  43. Jackson, Eric (2007). Shipping industry complains about PanCanal toll hikes. http://www.thepanamanews.com/pn/v_13/issue_06/business_03.html. 
  44. Sevunts, Levon (2005-06-12). "Northwest Passage redux". The Washington Times. http://www.washingtontimes.com/news/2005/jun/12/20050612-123835-3711r/. Retrieved 2009-04-20.  See also: Comte publisher=DefenceNews.com (Agence France-Presse), Michel (2005-12-22). "Conservative Leader Harper Asserts Canada's Arctic Claims". http://www.defensenews.com/story.php?F=1429085&C=america. Retrieved 2006-02-23. 
  45. "The Panama Canal - Frequently Asked Questions". http://www.pancanal.com/eng/noticiero/canal-faqs/physical/14.html. "Each lock chamber requires 101,000 m3 (26,700,000 US gal; 22,200,000 imp gal) of water. An average of 52,000,000 US gal (200,000,000 L; 43,000,000 imp gal) of fresh water are used [in a single passing]." 
  46. "Sea Level: Frequently asked questions and answers". Proudman Oceanographic Laboratory. http://www.pol.ac.uk/psmsl/puscience/. Retrieved 2009-01-08. 
  47. 47.0 47.1 "Relevant Information on the Third Set of Locks Project" (PDF). Panama Canal Authority. 2006-04-24. http://www.pancanal.com/esp/plan/documentos/propuesta/acp-proposla-relevant-information.pdf. Retrieved 2006-04-25. 
  48. "The Panama Canal". Business in Panama. http://www.businesspanama.com/investing/why_invest/panama_canal.php. Retrieved 2007-09-03. 
  49. Monahan, Jane (2006-04-04). "Panama Canal set for $7.5bn revamp". BBC News. http://news.bbc.co.uk/2/hi/business/4876322.stm. 
  50. Panama Canal Authority: Panama Canal Expansion is “2009 Project Finance Deal of the Year", 12 March 2010
  51. "Panama approves $5.25 billion canal expansion". MSNBC.com. 2006-10-22. http://msnbc.msn.com/id/10627208/. 
  52. Reagan, Brad (February 2007). "The Panama Canal's Ultimate Upgrade". Popular Mechanics. http://www.popularmechanics.com/technology/transportation/4212183.html. 
  53. Kaufman, Andrew (February 2010). "The Panama Canal Gets a New Lane". Popular Mechanics. http://www.popularmechanics.com/technology/transportation/4344444.html?page=1. 
  54. "Work starts on biggest-ever Panama Canal overhaul". Reuters. 2007-09-04. http://www.reuters.com/article/newsOne/idUSN0334522620070904. 
  55. "De Nul dredging company to build locks in Panama Canal". Flanders Today. 2009-07-17. http://www.mediargus.be/flanderstoday.admin.en/rss/22548040.html?via=rss&language=en. 
  56. Buckinghamcovers.com

Further reading

External links